Our history
Image Gallery
Jobs Executed
18 - 18
Simulacro nivel 2, derrame de hidrocarburos OAM.
Simulacro nivel 2, derrame de hidrocarburos OAM.
Simulacro nivel 2, derrame de hidrocarburos OAM.
Simulacro nivel 2, derrame de hidrocarburos OAM.
Simulacro nivel 2, derrame de hidrocarburos OAM.
Pozo Bonga 1.
Sistema CI. estacion Tenay
Punto de Control OAM.
Represa Usocoello.
Simulacro nivel 2, derrame de hidrocarburos OAM.
Simulacro nivel 2, derrame de hidrocarburos OAM.
Simulacro nivel 2, derrame de hidrocarburos OAM.
Simulacro nivel 2, derrame de hidrocarburos OAM.
Simulacro nivel 2, derrame de hidrocarburos OAM.
Simulacro nivel 2, derrame de hidrocarburos OAM.
Simulacro nivel 2, derrame de hidrocarburos OAM.
Simulacro nivel 2, derrame de hidrocarburos OAM.
Simulacro nivel 2, derrame de hidrocarburos OAM.
<
>
Consultancy for the development of the Contingency Plan 2012 Alto Magdalena Pipeline Hocol SA ToEiatec SAS, September to December 2011:
Review of operation of all operative and permanent control points current and potential suggested, and the contingency warehouses Coyaima ,Gualanday, Lerida and La Dorada, equipment and contingency crews personnel, control valves, etc.)
Analysis and simulation script processing level 2 intermediate level oil spill in the Upper Magdalena pipeline and support to Hocol SA.
Development of qualitative and quantitative technological risk analysis, standard operating procedures (Pons) for the Tenay pump station, Lerida ,Gualanday and La Dorada scrapers trap.
Incident Command System
Review Strategic Plan, Operating Plan and Informatic plan
Contingency Plan Development for the early start of the new units in the Project Ocensa 560. Prepared for D & R Consulting.
Fire and environmental audit (Contingency Plan) for Bonga well Hocol in Ovejas town, Sucre. Year 2012. To Eiatec S.A.S
Technical audit for environmental aspects of Huron 3 well Contingency Plan Hocol, 2012. To Eiatec S.A.S
Preparation of Spill Contingency Plan to Huron 3 well, Hocol Yopal, 2012. To Eiatec S.A.S.
Coordination of the implementation of the oil spill drill Level 2 intermediate level (local / regional) contingency plan 2012 Alto Magdalena Pipeline Hocol SA year 2012. ToEiatec H.S.H.
Update Contingency Plan Oil Field La Cañada NorteHocol SA, Eiatec work for SAS. Year 2012.
Consulting for Contingency Plan Update Pipeline TheHocha / Los Mangos Hocol in the department of Huila, To Eiatec SAS Year 2012.
Contingency Plan Development of the Alligators 2 Oil discharge station,Hocol, Eiatec work for SAS. Year 2012.
GESTION INTEGRAL EMPRESARIAL Y HSEQ S.A.S
Bogotá D.C.- Colombia
© 2013