OUR ACHIEVEMENTS
-
Consultancy for the development of the contingency plan (PDC) of the Alto Magdalena OAM Pipeline (496kms) owned by Hocol SA, includes the audit of all current and permanent operative control points and possible suggested ones, as well as the wineries of contingency of Estaciones Tenay, Coyaima, Gualanday, Lérida and La Dorada, equipment and personnel of environmental brigades, valve booths, etc. 2011,2012.
-
Analysis of quantitative risk and standard operating procedures (PONS) against fire for the Tenay station, scraper traps of the OAM (Coyaima, Gualanday, Lérida and La Dorada) and the Merlín well owned by Hocol S.A. Work done for Eiatec SAS. 2012
-
Advice for contingency plan and fire prevention on the above items. 2011,2012
-
Fire and Environmental Audit (Contingency Plan) for Bonga well 2011. Owned by Hocol S.A/Eiatec SAS
-
Environmental audit for (Oil Spill Contingency Plan) Huron 3 well of Hocol S.A. 2012, prepared for Eiatec SAS, owned by Hocol S.A.
-
Elaboration of oil spills Contingency Plan for Huron 3 Well and its access road owned by Hocol S.A in Yopal. 2012, prepared for Eiatec SAS.
-
Coordination of simulation execution level 2 (Tolima-Huila-Caldas) due to spillage of hydrocarbons in the Alto Magdalena OAM Pipeline owned by Hocol. 2012, prepared for Eiatec SAS.
-
Contingency Plan Update for the La Cañada Norte oil field owned by Hocol S.A. 2014. prepared for Eiatec SAS.
-
Updating of the Contingency Plan for oil spills from the La Hocha-Los Mangos pipeline owned by Hocol S.A (30 kms) Includes all control points, contingency warehouses, valves, etc. 2012,2013. Prepared for Eiatec SAS.
-
Analysis and modeling for risk scenarios of fire and explosion of the crude storage tank of the Jazmín station owned by Hocol S.A, elaboration of PONS. Prepared for Eiatec SAS. 2012
Consulting services for the company Occupational and Technological Risk Consulting (D&R) from the year 2011 to 2014:
-
Fire Engineering Projects, Analysis of Technical Information and Follow-up of Fire And Gas Engineering Projects for Oil Companies. Company: Prodeseg Industrial S.A. Prepared for D&R.
-
Basic Engineering With Details For The Design Of Fire Extinguishing, Detection And Alarm Systems In The CCM Of CPF2 In Campo Rubiales Meta. Company: Inelectra. Made for D&R.
-
Diagnosis for Connection to the Fire System of the Terpel Plant and Preparation of Basic Engineering and Detail for Fire Protection of the New Operational Facilities of the Toldado – Gualanday Pipeline (Tolima) Belonging to the Transportation Vice Presidency of (VIT) of Ecopetrol SA, Company: Ismocol. Prepared for D&R.
-
Design and Implementation of a Fire Protection Contingency Plan for early starting of Pumping Unit in the Ocensa 560 Project, Vasconia Plant of the VIT - Ecopetrol S.A, Company: Ocensa. Elaborated for D&R.
-
Development of Conceptual Engineering for Fire Protection of Fuel Supply Installations for Aircraft of the Lieutenant Coronel Luis Fernando Pinto Military Air Base, Located in Melgar (Tolima). Company: Prodeseg S.A. Prepared for D&R.
-
Enlistment and Accompaniment of the Protection and Fire Protection Plan and Environmental Start-up of Pumping Units in the Vasconia Station - Ocensa Project 560. Company: Ocensa. Prepared for D&R.
-
Drill for a Fire Event during Drilling Well Head Tests, in order to put into practice the actions proposed within the operative standar procedures. Installation: Garnet-1 Gas Well (Perdices Block). Owner: Hocol. Prepared for D&R.
-
Development of Basic Engineering Detail for Fire Protection of Storage Tank 1017 in the Cartagena Refinery Docks of the VIT Transportation Vice Presidency of ECOPETROL S.A. Company: DIMECAR LTDA & INGENIEROS ASOCIADOS LTDA. Prepared for D&R.
-
Diagnostics of the Fire System of the Battery Mary Located at South East of the Municipality of Mocoa, Department of Cauca, Belonging to Gran Tierra Oil Company: PT INGENIERIA S.A. Prepared for D&R.
-
Elaboration of the Oil Spill Contingency Plan and Evaluation of the Fire System of the “La Cristalina Electric Substation (115 Kva / 34.5 Kva) of Ocelote Oil Field of Hocol S.A, Located in the Municipality of Puerto Gaitán (Meta). Company: EIATEC. Prepared for D&R.
-
Development of basic and detailed engineering for fire protection with water sprinklers for the ECOPETROL S.A MAIN COMPUTER CENTER, located in Mansilla Terminal, Municipality of Facatativá (Cundinamarca). Company: Prodeseg S.A.
-
Counseling in Fire Contingency for the Location of the New Tank Sink of the Pumping Project 560 of Ocensa S.A, Located in the Vasconia Station, Municipality of Puerto Boyacá (Boyacá). Company: Ocensa S.A
-
Fire System Audit of the BIO-D Biodiesel Plant Located at the Mansilla Terminal of Ecopetrol SA in Facatativa (Cundinamarca). Company: Prodeseg S.A
-
Diagnosis of the fire protection systems installed in the Gigante Gas field (Huila) belonging to Emerald Energy PLC Branch Colombia - S.A.R Energy S.A.S, for the development of basic fire engineering of the plant. Company: S.A.R ENERGY S.A.S. Prepared for D & R.